- Install the 5th synchro sleeve.
  
	- Install the ball bearing (A) using the special tools and a press (B).
 
 
  
 |   | 
- Measure the clearance between 1st gear (A) and the countershaft (B) with a feeler gauge (C). If the clearance is more than the service limit, go to step 2.
  
Standard:  | 
0.03 - 0.12 mm
 (0.001 - 0.005 in.) 
 | 
 
Service Limit:  | 
0.22 mm (0.009 in.)  | 
 
  
 
 
	- Measure the thickness of 1st gear.
 
 
	- If the thickness of 1st gear is less than the service limit, replace 1st gear with a new one.
 
	- If the thickness of 1st gear is within the service limit, replace the 1st/2nd synchro hub with a new one.
 
 
Standard:  | 
26.91 – 26.94 mm
 (1.059 – 1.061 in.) 
 | 
 
Service Limit:  | 
26.86 mm (1.057 in.)  | 
 
 
  
 |