- Loosen the valve on the regulator and apply the specified air pressure.
  
Specified Air Pressure: 
250 kPa (2.5 kgf/cm2, 36 psi)
 
	- With the specified air pressure applied, push up the timing plate (A); the synchronising piston will pop out and engage the intake primary rocker arm (B) and intake secondary rocker arm (C).
 
 
NOTE: 
	- The synchronising piston (D) can be seen in the gap between the secondary and primary rocker arms.
 
	- When the timing plate is engaged in the groove A (E) on the timing piston (F), the piston will be locked in the pushed out piston.
 
 
 
  |   | 
	- Stop applying air pressure and push up the timing plate (A); the synchronising piston (B) will return to its original position with a click.
 
 
Visually check the disengagement of the synchronising piston.  Replace the intake rocker arms as an assembly if there is any abnormality. 
NOTE: When the timing plate is pushed up, it releases the timing piston (C), letting the return spring (D) move the synchronising piston to its original positions. 
 
 
	- Remove the valve inspection set from the inspection hole A, then tighten the sealing bolt.
 
	- Remove the sealing bolt (A) from the inspection hole B (B) and connect the valve inspection set.
 
 
  
 |